Jitterbit · Harmony runtime

Long running operation canceled by System

Short answer

This Jitterbit message appears when an operation stuck in Submitted or Running is canceled, typically because a private agent lost contact with Harmony or the agent group had no free capacity. For private agents, confirm the agent is Running on the Agents page, review the private agent logs for connection issues, and verify a stable network connection to Harmony.

VerifiedLast verified

01Error text

Jitterbit error
Long running operation canceled by System

02Likely causes

  • A private agent lost its connection to Harmony and could not report operation status.
  • The operation completed, but its final status was not reported back to Harmony.
  • The agent group is under heavy load and is slow to pick up or update queued operations.
  • No agent in the group accepted the run message because agents were offline, unhealthy or had no free capacity.

03How to fix it

  1. For private agents, confirm the agent is Running on the Agents page, review the private agent logs for connection issues, and verify a stable network connection to Harmony.
  2. Review the operation logs for errors such as 401 Unauthorized or 429 Too Many Requests.
  3. Keep private agents on a current version.
  4. Cancel the affected operations. If they cannot be canceled or the problem recurs, contact Jitterbit support.

iNotes

A 429 from the Jitterbit cloud API gateway reflects its limit of 200 requests per minute.

04Official documentation

Test every fix in a non-production environment before you apply it to production. See how entries are verified.

More for Jitterbit work:Open Jitterbit jobsJitterbit rates and salaries

The iPaaS Brief

Subscribe to The iPaaS Brief.

The iPaaS newsletter for the people who run integrations. From iPaaS Group.

Free. You finish on theipaasbrief.com and confirm by email.